Supply, Installment and also appointing of Waste Incineration system

Page|5

– Temperature degree of second and key chamber.
– All the burner parts including fuel pumps, followers, pipelines and also shutoffs can be conducted in high ambient temperature level (50OC).

The bidder will give all vital information connected to the facility dimensions, room area needed for the entire system as well as all procedure needs, Details regarding required center (wall mount) including Design, civil job and also electromechanical details including power, water pipes, fuel pipelines, tanks, etc. Called for Operation employees, Fuel intake cost of the whole system. Considering that our job is a turnkey task including Style, Build & & Operate of fundamental incineration facility covering all the aforementioned information and we must work with all civil tasks as well as essential should run the system.

In the Structure of our Specialized Projects Administration, we are presently in search for distributor of Waste Incineration system for dangerous waste, the incineration system will surely be used for incineration of Prohibited Drugs as well as toxic materials, waste fowl, Dead Animals “cows, goats”, Spoiled veggies, AND SO ON at customizeds Ports. For that we would like to need for your economic and technical Proposal for distribution, setup and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr. 3

The proposal should include the comprehensive summary of the whole system: Overall expense of supply, Setup, appointing, Automatic feeding, automatic de- ashing throughout process, as well as efficient gas cleanup system (damp, dry or high temperature ceramic filters), constant discharge monitoring system (CEMS), as well as all other accessories, Control panel for all elements of this machine, Repairing alarm system covering all areas of the system, to alert the operator for the error that might develop throughout the process, and to do instant corrective actions, Emergency Quit button which can quickly shut off/ shut down all significant part of the system in situation of crisis situation., Packing system: side loading, Number of burners: minimum 7 burners, (5 for key chamber, 2 for second room ), Gas: Diesel, The system must function constantly for at least 12 hrs per day, The vital chamber: Heavy- duty anodized Rust resistant steel casing with minimal thickness 7mm.

The bidder will provide all necessary details associated with the center dimensions, space area required for the whole system and also all operation needs, Information regarding needed facility (wall mount) including Layout, civil work and electromechanical information including power, water pipelines, fuel pipelines, storage tanks, etc.

The bidder shall provide all necessary details associated with the facility measurements, space area required for the entire system and all performance requirements, Details regarding required facility (hanger) including Layout, civil work and electromechanical details including power, water pipes, fuel pipes, tanks, etc.. Complete Drawing & 3D drawing Certainly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the entire system. Since our project is a turnkey project including Design, Build & Operate of fundamental incineration facility covering all the aforementioned details and we must coordinate all civil works and necessary requirements to operate the machine.

– ten years warranty for offering extra parts starting from the date of initial warranty expiry.
– The major entrance of the Burner ought to be 150 mm thick as well as stamina not less than 170 kg/m3. The door ought to be automatic with remote to function.
– The distance between the outside and inner body is going to be loaded with the unique insulation material.
– Alarm revealing if there is any sort of leakage or misconducting in the power.
– All the supporting dental braces of the burner shall be mounted on stainless-steel.
– The incinerator will have control apparatus for exhaust gases to ensure that the emission shall meet the PME resource standards
– Sign for straining the heater.
Kindly request to get even more info on burner innovation because it is needed to process 100 heap to 500 load waste aday. In the Structure of our Specialized Projects Monitoring, we are currently in look for distributor of Waste Incineration system for hazardous waste, the incineration system will surely be used for incineration of Prohibited Drugs and toxic substances, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. in custom-mades Ports. For that we would like to request for your technological and Fiscal Proposal for distribution, setup and also Commissioning of Contaminated materials Incineration system with incineration capacity of at the very least 400 Kg/ human resources.

Web Page
– 3 years warranty with extra components and also technical supply and.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
– There needs to be a stack with 4 (4) meter from the leading surface area of the burner as well as can be removed as well as set up.
– The Incinerator ought to be developed in accordance of the environmental law adhered to in nation of origin or according to Saudi Arabian PME Rules.
– Condition of pressure gages.
– All components of this burner will be repainted in 1 shade which ought to be resistant to high humidity, heat as well as high dust/ sandstorm.|– All components of this burner will be repainted in 1 shade which ought to be resistant to high humidity, heat as well as high dust/ sandstorm.