medical incinerators in china

Would plant operations be usable on a basis of 24 hours per day, 7 days a week, all year long except for

regular and preventative maintenance periods? What volume and characteristics of

ash could be produced from these solid wastes valorization?

  1. How many hours per year could your process be operational?

 

  1. What would be your approach for larger projects aiming to valorize 1 000 tons per day?

wastes?

  1. How much electricity could be produced using you technology based on a 1 000 tons per day installation to

 

 

factor would you run the station at?

 

  1. What would be the capital cost necessary to meet the requirement to valorize 1 000 tons per day of urban

some air emissions from the process, how can air emissions be controlled to fulfill environmental norms?

 

  1. What would be the selling price of electricity per kWhour to meet targeted profitability?

engineering, engineering for site work, buildings, electric hook up to existing electrical network? Do you have

  1. Could you valorize sludge volumes coming from sewage treatment plants and if so at what maximum humidity

complete construction capabilities or would you require a local partner to carry out which part of construction

work? Would you also operate the station or use a local partner to run the station?

  1. Considering that your process is an incineration process, oxygen will be required, therefore there will be

 

financing would most likely not be required but this might be true in other countries in which Gestech International

  1. What would be your implication in any project : would you prepare process engineering, electricity production

is presently involved in.

complete construction capabilities or would you require a local partner to carry out which portion of construction

work? Would you also operate the station or use a local partner to operate the station?

 

  1. Do you also have the financing capacity for the design, construction and operation of any project? In Algeria,

financing would most likely not be required but this could be the case in other countries where Gestech International