medical incinerators

● Able to shed 25-30kg per hour

· Total waste created each day: 10-12 tonnes;

· Hours of Operation: 10 hrs per day;

· Fuel requirement: Diesel or waste oil selected yet LP gas is going to be thought about;.
Diamention: Size (mm).
Secret Features.
House Time in Second Chamber.
1320