Heater ability of devastation of 350 kg/hour

– – – – – – – – Control board will absolutely be fitted with a valuable synoptic view representing the working scenario of the whole

heater in addition to also cared for by DCS/PLC system.

– – – – – – – – Heating system will definitely be produced as a Packaged system, having electrical link last in addition to pre-wired pipes

in placing.

– – – – – – – – Waste will certainly be with automatic feeding system directly into the heater.

– – – – – – – – Control board will absolutely be fitted with a valuable synoptic view representing the working situation of the whole

heating system in addition to likewise managed by DCS/PLC system.

– – – – – – – – TOC of slag in addition to bottom ashes will certainly be much less 3 percent of the completely dry weight.

– – – – – – – – Heater will certainly be made as a Packaged system, having electrical link pre-wired in addition to last pipes

in placement.

– – – – – – – – Burner will surely have automatic de-ashing system with higher directions.

set up.

– – – – Incinerator will have automatic de-ashing system with upward direction.

– – – – Burner will surely have flue gas therapy system comprehensive [emergency situation by-pass pile, gas cooling system,

two activators in addition to additionally particulates filtering system] as well as assurance of discharges out of burner.

– – – – Training of AKU workers at website.

– – – – Web site could be reviewed in addition to likewise have a look at existing ATI manufacturer, capability 150 kg/hr. In 1 day treatment.

– – – – Existing facilities space is conveniently located in basement, 100′ ′ Size x 30 ′ large x 20 ′ Altitude for 2nd Incinerator.

– – – – Existing smokeshaft size is 12 meter, and also size is 24″ ″ dia.

{
(adsbygoogle = window.adsbygoogle || []).push({});|}{
(adsbygoogle = window.adsbygoogle || []).push({});|}

common daily bloodbath involves 120 pigs. The Condemned thing combined with also results from the abattoir for disposal is around 1000 kgs.daily