Capability of destruction in weight 60 Kg/h

* A switch breaker for every engine (ventilators and also burners).
Natural rubber, synthetic rubber, polyurethane sheet, and cumbersome movies, solids and also
* The insulation of the burning chamber should be composed of refractory bricks, using a high content of aluminum

and also insulates bricks in order to guarantee a minimum temperature on the outside sheet metal.
8. It ought to have the ability to hold exhaust at the 2nd melt with gasoline house of not less than 2 seconds.
From the mill; it’ll consist of medicinal and preventive upkeep, and using apparatus, etc

after the control of the automatic cycle.
12. The loudness of the burning chamber: 1.200 L.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

electronic ignition, irreversible air flow, electro-magnetic sluice gate of legislation in addition to separating shutoff.
* A regulatory authority with watch for the temperature of blog post combustion.
* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, in addition to packing protecting

from refractory.
.
21. Controls in addition to policies:.
– – fragments which can be easily arranged
* Make-up of the refractory;.
3. This incinerator should be able to destruct all combustible wastes created by medical facilities, exclusive facilities,

laboratories, institutes, etc..
– – Assumption: general medical facility beds 50 percent, operation beds 50% for the 100 bed health centre situation, while this

ratio is 30-70% for the other situations
* A sheath of release of the gases scorched.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
2. What about the warm created during burning, are there windows or air circulation into the containers.

–– Intake of electricity and also gas. Medical facility garbage disposal system for a medical facility project

–– Ash elimination odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE and also marginal carbon discharge.

–– Automatic treating process temperature regulated chamber.Incinerator with 150l waste chamber

–– Second chamber. Do you have plans for above incinerators revealing flooring dimensions, height. What products should be utilized for your FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The only consumable required for the system TS100

(PLC) is Oil( diesel) is that OKAY?

2) from your technological requirements: oil intake (Kg/hour) is between 14–– 28) do you suggest is liters/hour?

instance the incinerator will be operating for 10 hours daily indicates that the oil use will be 140 Litres or more?

3) Chimney type stainless steel. Just how around main body construction and building materials?if there are a lot more two alternative of text

construction and building materials for greater life

3. Send out information concerning electrical power, ventilation, fire protection, wears down, chimney etc

4.

5. We see you have container shelters. Send us value quotation for this item

1. Capability of damage in weight: 60 Kg/h.
– Shield in fibrous panel.
– – Chemical waste solids and also liquids, waste oil and also various other difficult-to-handle items

The apparatus will definitely be licensed for operation from PME after passing website investigations.Manual tons double chamber

burner for clinical waste to melt 50kg/hr on continuous procedure, with Main temperature level roughly

800degC minimal and 1200degC or more in the Additional chamber, full with charging door, Ash door, Air in addition to check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to

meet NEMA requirements in addition to various other worldwide requirements. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we admire are:

–– Capability (burning capacity of waste per hr). 150kg/hour. Burner with 300l waste chamber

–– Build goods, 5mm Excellent excellent light steel construction; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and also over 50 physician offices.
9. The incineration must be totally devoid of visible smoke in addition to offensive odours.
2. It must have the ability to operate not less than 10 hours/day
– – Items that easily deteriorate like paper, wood, natural leather and garbage
* A timer with adjustable temporization for the law of each burner.
– Character: Calcium silicate.
6. The incinerator has to stay clear of the launch of black smoke in addition to fine dust, (Electric) through the loadings.
* A heater of lighting which the usage is limited to the ignition of waste.
17.
– Refractory concrete:.
* A burner of burning of gases,.
24. The provider will perform an onsite installment of this incinerator.
– Message combustion: >> 1100oC.
INCINERATOR, DIESEL.

CAPABILITY: Burner 150 kg/hr.

Amount: 2 [2] with complete accessories.

Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
* A secondary shot of air to guarantee excellent oxygen net content.
Would certainly it be possible to provide us information on the capability of burner we need

on this island.

–– Approximately 150 KG/Hrs. Burner to dispose our day-to-day regular death for this size of this ranch.1. Can the

100kg/hr melt solid waste/hazardous waste like died paints, waste oil or chemicals.
14. Heater procedure should be Automatic On/Off.
* A tool of injection of air allowing an overall re-combustion of gases,.
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
* Heater with gasoline, mono-bloc casting guiding type with horizontal flame, lighting in addition to safety of electronic

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.

clinical waste incinerator solutions in addition to prices for 100 bed/ 500 mattress / 1000 mattress / 3000 bed healthcare facilities.
22. The supplier must give batches of spare pieces of first urgency in addition to consumable of this burner.
23. Ability to treat Plastic: Not less than 40 percent by weight.
. Nature: 42% of Al203.
7. It must be able to decrease the volume of wastes by 98%.
22. Process Filtering system: Scrubber to be stated as optional.
–– global criteria and waste productions assumptions should apply
* Flawlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Tons.
. Density: ≥ 100 mm
* A regulator with electronic viewing for the temperature of burning.
Nature: 65 percent of Al203.
– The Temperature levels of burning: Minimum will be 850oC as well as max 1400oC
13. The Measurement of the door for packing in centimeters: 70×× 70.
– Refractory concrete:
* Carcass in strong sheet steel with support of link.
19. A control box making certain the complete cycle of burning.

20. Follower:.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc